Sea Freight & Containers

How to Plan a Container Load: Weight Distribution, Stacking and Dunnage

How to Plan a Container Load: Weight Distribution, Stacking and Dunnage

A container loading plan shows where every package goes. This keeps the total weight within the payload. Heavy goods should sit low. The center of gravity must stay near the middle. As a result, nothing can shift in transit. The numbers are more important than the sketch. For example, loading a heavy block at the front of a 20ft puts the center of gravity 0.72 m forward of the middle. Simply reordering the same cargo brings it back to the center. Use the calculator below to get the carton count. Then, work through the checks in this guide.

Container loading calculator (cartons per container)

Runs in your browser; nothing you enter is sent anywhere. Carrier figures differ, so confirm the final numbers with your forwarder. Whole shipment: all-in-one freight calculator →

What a loading plan has to cover

A workable plan answers six questions:

Container loading plan: Shipping containers stacked at a port with a large crane in the background.
  1. Weight: does the total cargo, including pallets and dunnage, stay within the container’s payload?
  2. Distribution: Is the weight spread along the floor? Also, is it balanced from left to right?
  3. Stacking: how many tiers can each carton take without crushing?
  4. Securing: how will gaps be filled so the cargo cannot move?
  5. Sequence: what goes in first, so the consignee can unload in a sensible order?
  6. Paperwork: Does the packing list match the box contents? In addition, is the verified gross mass ready?

The IMO’s informative material for the CTU Code (MSC.1/Circ.1498) is the reference document. You should read it for detailed packing and securing guidance.

Step 1: check weight against payload

Add up every package, then add pallets, dunnage and lashing material. SOLAS Method No. 2 for the verified gross mass counts “the mass of pallets, dunnage and other securing material”, so your plan should too. Published payloads vary by carrier. Hapag-Lloyd’s figures:

A balance scale with two empty pans, symbolizing weight measurement.
ContainerInside L × W × H (mm)Door height (mm)Max payload (kg)
20ft standard5,900 × 2,352 × 2,3952,29228,130
40ft standard12,032 × 2,352 × 2,3952,29228,750
40ft high cube12,032 × 2,350 × 2,7002,59728,600
45ft high cube13,556 × 2,352 × 2,7002,59727,700

Other lines list different tares and gross ratings. Therefore, a 40ft container can carry about 2 tons more or less. This depends on the specific box. You should check the payload for the actual equipment. Find this information in container weight limits. Road limits at origin or destination can be lower than the container’s rating. So, ask your trucker about these limits for a container loading plan.

Step 2: work out safe stacking tiers

The inside height limits your number of tiers. You also need clearance under the ceiling. Carton strength is another limiting factor. For example, Mighty Shipping is a forwarder. They have a rule of thumb for a container loading plan. Carton crush strength usually limits stacking to 6–8 tiers. Also, the top 5–10 cm is lost to door clearance. Use the carton maker’s stacking limit if they mark it.

A wall of stacked colorful plastic crates.

Tiers = floor((inside height − clearance) ÷ carton height), capped at the carton’s stacking limit

Example 1: 38 cm cartons in a 20ft vs a 40ft high cube

Cartons are 38 cm (15.0 in) tall.

  • 20ft standard: 2,395 ÷ 380 = 6.30 → 6 tiers. Stack height 6 × 380 = 2,280 mm, leaving 2,395 − 2,280 = 115 mm, which covers a 5–10 cm clearance.
  • A 40ft high cube can hold 7 tiers on paper. This is because 2,700 ÷ 380 = 7.11. The stack height would be 7 × 380 = 2,660 mm. This leaves only 40 mm of space. However, the rule of thumb says you lose 5–10 cm. Therefore, plan for 6 tiers. Do this unless your loader confirms that 7 is workable.

If the carton is marked for a maximum of 5 tiers, 5 is the answer in both boxes, whatever the height allows. Put the heaviest, strongest cartons in the bottom tiers and light, fragile ones on top.

Step 3: keep the center of gravity near the middle

Heavy cargo at one end makes the container nose-heavy. This affects the chassis and also handling. You can work out the lengthwise center of gravity (CoG) for a container loading plan with this formula:

A forklift loading goods into a truck, with a worker guiding.

CoG = Σ (weight of each block × distance of its center from the front wall) ÷ total weight

Then compare it with the container’s midpoint.

Example 2: reordering two cargo blocks in a 20ft

A 20ft has 5.9 m of inside length, so the midpoint is 5.9 ÷ 2 = 2.95 m from the front wall. The cargo is block A, 8,000 kg of machine parts filling 2.5 m of floor, and block B, 4,000 kg of light cartons filling 3.4 m.

Plan 1: A at the front, B behind it.

  • A sits from 0 to 2.5 m, center at 1.25 m
  • B sits from 2.5 to 5.9 m, center at 4.2 m
  • CoG = (8,000 × 1.25 + 4,000 × 4.2) ÷ 12,000 = (10,000 + 16,800) ÷ 12,000 = 2.233 m
  • Offset: 2.95 − 2.233 = 0.717 m forward of the middle

Plan 2: Split B into two halves. Each half weighs 2,000 kg. Also, each half is 1.7 m long. Then, place A in the middle.

  • B1 from 0 to 1.7 m, center at 0.85 m
  • A from 1.7 to 4.2 m, center at 2.95 m
  • B2 from 4.2 to 5.9 m, center at 5.05 m
  • CoG = (2,000 × 0.85 + 8,000 × 2.95 + 2,000 × 5.05) ÷ 12,000 = (1,700 + 23,600 + 10,100) ÷ 12,000 = 35,400 ÷ 12,000 = 2.95 m, centered

Also, check the same across the width. Keep heavy items centered. Alternatively, match them left and right. If you have a single very heavy item with a small footprint, ask the line about concentrated load limits for the floor in a container loading plan. Do this before booking.

Step 4: fill gaps and secure the load

Gaps allow cargo to shift. Shifting cargo crushes cartons. Also, it can damage the container. Therefore, you must calculate the gaps. Use your carton count to do this.

Trucks secured with straps on top of shipping containers on a ship.

Example 3: the width gap

Cartons 45 cm wide loaded five across in a 2,352 mm-wide box use 5 × 450 = 2,250 mm. That leaves 2,352 − 2,250 = 102 mm of open width along the whole row. Fill it with dunnage, such as timber, cardboard or foam, or with an airbag, especially near the door.

  • Dunnage and airbags take space. Allow for them in the plan rather than finding out at the loading bay.
  • Block the last row at the door so nothing falls when the doors open.
  • Lash or brace heavy single items. You should also secure any pallets. Do this if they do not fill the container’s width.

These gaps are part of broken stowage, the space a container never lets you use.

Step 5: load in delivery order and match the paperwork

  • Load last-out first. Goods the consignee needs first should go in last, near the door.
  • Keep each SKU or purchase order together and mark the plan so the receiver can check quickly.
  • Build the plan from a package-level list. iContainers advises preparing “a package-level packing list rather than relying only on a total CBM figure”. Your commercial invoice and packing list should match the plan line by line.
  • Declare the VGM by weighing the packed container (Method No. 1) or by adding all packages and materials to the tare (Method No. 2). See verified gross mass.

Common mistakes

  • Planning on total CBM only. Shipment volume says nothing about whether cartons fit the box’s dimensions; see how many cartons fit in a container.
  • Stacking to the ceiling. Leave clearance and respect carton stacking limits.
  • Putting all the heavy goods at the front because they arrived first at the warehouse.
  • Mixing pallets and loose cartons without a plan. Decide early using palletized vs floor-loaded containers.
  • Forgetting dunnage weight in the payload and VGM totals.

FAQ

What is a container loading plan?

A container loading plan is a written layout. It shows where each package goes. It also specifies the loading order. You will see how high to stack items. Furthermore, it details how to secure them. The plan also checks the total weight against the payload. Finally, it ensures the weight is balanced.

Where should heavy cargo go in a container?

On the floor and spread along the length so the center of gravity stays near the middle. Light and fragile cartons go on top.

How many tiers can cartons be stacked in a container?

It depends on carton strength and inside height. One forwarder rule of thumb puts the practical limit at about 6–8 tiers, but the carton’s own stacking marking takes priority.

What is dunnage?

Dunnage is material such as timber, cardboard, foam or airbags used to fill gaps and stop cargo moving. Its weight counts toward the VGM under Method No. 2.

Do I need a loading plan for LCL cargo?

The consolidator plans the shared container. However, you still need accurate dimensions and weights for your own cargo. Also, provide stacking limits and a packing list for your items.

Sources and further reading

Calculate your whole shipment

Enter every carton size once: get CBM, cubic feet, air and sea chargeable weight, freight class and the container that fits.

Open Calculator

Latest in Sea Freight & Containers

Sea Freight & Containers →

Leave a Reply

Your email address will not be published. Required fields are marked *